Product Details

+
  • 平台式1.png
  • 平台式2.png

PenePlater Platform CPT System


The main feature of the PenePlater is that the penetration equipment is mounted on a fixed platform, and the probe rod needs to pass through the water layer from the platform deck before penetrating into the seabed soil during the CPT operation. The datum for the CPT can be taken from either the platform or the seabed surface, and the datum is unique after it has been established.

Key words:

PenePlater Platform CPT System


Previous Page

PeneTruck-I CPT Truck

How can we help?