Project Case Details

CPT Survey for China Huaneng Guanyun Offshore Wind Farm


The project was located in the sea area of Lianyungang, Jiangsu Province. The site was about 7.3km wide from north to south, 8.5km long from east to west, and the center of the site was about 12km away from the coast. The whole site covered an area of about 62km², the actual area of the offshore wind turbine layout was about 45km², and the water depth was about 8~15m. The seafloor formation in the construction area was particularly dense and thick, and the weather during the operation period was unusually harsh. Our service team has overcome the impact of strong cold air on-site, and completed the operation within 47 days.

Classification: