News Details


25

2015

-

09

Our Offshore CPT System was reported by the Science and Technology Daily

Author:


On September 13, 2015, as the PeneVector-II Seabed CPT System was hoisted onto the vessel's deck, Peneson initiated the geotechnical survey for the Yangtze River Crossing Tower project. Notably, this marked the maiden operation of Peneson's offshore CPT system in support of a national major construction project, garnering coverage in Science and Technology Daily.

 

On September 13, 2015, as the PeneVector-II Seabed CPT System was hoisted onto the vessel's deck, Peneson initiated the geotechnical survey for the Yangtze River Crossing Tower project. Notably, this marked the maiden operation of Peneson's offshore CPT system in support of a national major construction project, garnering coverage in Science and Technology Daily.

According to the introduction of Mr. Wang, who is the project leader and deputy general manager of Peneson Geological Technology, the system carried out CPT investigation in the shallow water area of the south tower of the Yangtze River Changshu section, and the depth of the investigation has been highly recognized and praised by the project owner.

Peneson is responsible for the technical development and production of the PeneVector-II Seabed CPT System, which is suitable for a water depth of 200m, and a penetration force of 50kN. The system has previously demonstrated its capabilities through numerous successful operations in East Lake and the South China Sea. Mr. Wang emphasized that the "Yangtze River Crossing Tower Project" represents a pivotal milestone for the Peneson CPT System in the market.